Posted inAssam

334-km of track electrified by NFR during 2020-21

Maligaon: Electrification of railway tracks is under various stages of execution in sections of Northeast Frontier Railway (NFR). The whole of the NFR track, including branch lines, was sanctioned for 100% electrification in the budget of 2017-18. The total cost of the entire electrification work is Rs. 2,542.62 crores (approx). The Indian Railways has attained the […]